Applied Applications International
Search this site:
Skip to content
Home
About
Contact
Links
News
Products
Where to Buy
Quicklinks
Brochure
Cost Calculator
Features
Installation
Models
Where to Buy
Home
>
Products
>
Speedi-Boot
> Cost Calculator
Speedi-Boot - Cost Calculator
A
B
C
D
E
F
G
1
REGISTER BOOT INSTALLATION COST CALCULATOR
2
LABOR BURDEN
$
VENT BOOTS PER
3
TASK
SPEEDI-BOOT
REGISTER BOOT
4
MINUTES
LABOR $COSTS$
MATERIAL $COSTS$
MINUTES
LABOR $COSTS$
MATERIAL $COSTS$
5
ROUGH-IN
6
SPEEDI-BOOT COST
$
7
SPEEDI-BOOT INSTALL
$
8
REGISTER BOOT COST
$
$
$
$
9
TOOL SET UP
$
$
$
$
10
SOURCE BOOT SUPPORT MATERIAL
$
$
$
$
11
INSTALL REGISTER BOOT MUD-RING
$
$
$
$
12
INSTALL REGISTER BOOT SUPPORT
$
$
$
$
13
INSTALL REGISTER BOOT
$
$
$
$
14
MASTIC SEAL REGISTER BOOT
$
$
$
$
15
INSTALL DUST & DEBRIS COVER
$
$
$
$
16
SEAL REGISTER BOOT TO SUBFLOOR / DRYWALL
$
$
$
$
17
CALL BACKS
$
$
$
$
18
Sub Total
$
$
$
$
19
Rough-In Total
$
$
20
TRIM-OUT
21
PROTECT FLOOR & OR CLEAN
$
$
$
$
22
REFORM BOOT
$
$
$
$
23
CLEAN VENT BOOT
$
$
$
$
24
SEAL BOOT to BUILDING ENVELOPE
$
$
$
$
25
INSTALL TRIM
$
$
$
$
26
CLEAN DUCT SYSTEM
$
$
$
$
27
CLEAN FURNACE COILS
$
$
$
$
28
CALL BACKS
$
$
$
$
29
Sub Total
$
$
$
$
30
Trim-Out Total
$
$
31
Rough-In & Trim-Out TOTAL
$
$
32
ADMINISTRATIVE
33
SCHEDULE - TESTING
$
$
34
INSPECTOR - RED TAGS
$
$
35
CALL BACK SCHEDULING
$
$
36
Administrative Total
$
$
37
Rough-Trim-Admin Total
$
$
38
TOTAL PROJECT COST
$
$
39
SAVINGS PER PROJECT
$
40
TOTAL MAN HOURS SAVED
$
41
ACTUAL PROJECT SAVINGS
$
Instructions:
Enter the
Labor Burden
in the yellow field in cell B2.
Enter the
# of Register Boots
for each project in the yellow field in cell G2.
Enter the
# of Labor Minutes
in the yellow fields for each task.
Enter the
Material Costs
in the yellow fileds for each task.
The
Labor Costs
based upon the
Labor Burden
will be calculated.
The
Labor Minutes
and
Material Costs
totals will be calculated.
The
Total Project Cost
will be provided based on the sum of each installation phase total.
The
Total Man Hours Saved
is the difference in Speedi-Boot - Register Boot labor minutes divided by 60.
The
Actual Project Savings
equals the Savings per Project plus the Man Hours Saved.